Crew reviewing a Job Hazard Analysis before shift

Job Hazard Analyses (JHAs)

Task-level hazard identification and control selection that aligns with production windows, permits, and site rules—clear, actionable, and auditable.

Why JHAs Drive Safe, Predictable Work

JHAs translate hazards into step-by-step controls for industrial demolition, press line dismantling, rigging & heavy equipment removal, and crane work supported by Lift Plans. They also dovetail with LOTO, permits, and owner policies to keep crews aligned and documentation tight.

What’s in a WA Industrial JHA

Hazard ID & Controls

  • Task steps broken down with associated hazards
  • Engineering, administrative, and PPE controls selected
  • Energy sources identified with LOTO tie-ins
  • Environmental factors (dust, noise, heat/cold, lighting)
  • Public/adjacent operations and traffic interfaces

Permits & Coordination

  • Hot work, confined space, line break, and crane permits
  • Utility locates, verifications, and hold points
  • Interface with Lift Plans and rigging plans
  • Owner/AHJ requirements embedded in steps
  • Roles, communications, and stop-work authority

Records & Evidence

  • Daily attendance/sign-in with time and supervisor
  • Photo evidence where required (pre/post conditions)
  • Variance capture and corrective actions
  • Owner/insurer audit-ready PDFs on closeout
  • Linkage to Project Management & Safety

How We Build and Run JHAs in the Field

1) Scope & Walkdown

Confirm steps, interfaces, utilities, and logistics. Reconcile drawings and existing conditions to avoid surprises.

2) Draft & Review

Translate hazards into specific controls; align with permits, LOTO, and Lift Plans. Owner review as needed.

3) Pre-Task Brief

Daily sign-in, role assignments, radios/hand signals, barricades, and stop-work criteria reinforced with the crew.

4) Execute & Record

Supervisor verification, variance capture, photo logs, and close-out PDFs for owners, insurers, and auditors.

Integrated With Your Safety System

Our JHAs interlock with LOTO programs, Lift Plans & Critical Lifts, Project Management & Safety Oversight, and operational scopes like Industrial Demolition and Press Line Dismantling.

Documentation & Standards

  • Daily JHA forms with task steps and controls
  • Attendance logs and supervisor sign-off
  • Photo evidence appended where required
  • Variance tracking with corrective actions
  • Alignment with OSHA 29 CFR 1910/1926
  • Integration with permits and owner policies
  • Audit-ready PDF packages for closeout
  • Retention per owner/insurer requirements

Related Services

LOTO Programs

Energy isolation, MSPs, zero-energy verification, and program audits that pair with your JHAs.

Lift Plans & Critical Lifts

Engineered picks with stamped drawings, communications plans, and on-site oversight.

Project Management & Safety

On-site oversight, permits, daily logs, and close-out packages that keep owners confident.

Supervisor leading a pre-task briefing

Need JHAs for Your Next Outage?

We’ll build task-specific JHAs that line up with LOTO, Lift Plans, and your owner requirements—fast.