Project Management & Safety Oversight

End-to-end control of high-risk work — integrated with Industrial Demolition, Press Line Dismantling, and Asset Recovery & Recycling.

End-to-End Oversight for Industrial Decommissioning

We bridge operations, EHS, and trades so high-risk scopes stay predictable and auditable. Our team coordinates LOTO, daily JHAs, and Critical Lift Plans while controlling schedule, documentation, and change management. Bundle with Industrial Demolition, Press Line Dismantling, Rigging, and Asset Recovery.

Project Management & Safety Capabilities

Planning & Controls

Field Oversight

  • Daily huddles, toolbox talks, and audits
  • Barricades, signage, access & egress control
  • QC/QA checks, vendor management, RFIs
  • Photo logs, variance capture, schedule control

Turnover & Reporting

  • Manifests, weight tickets, inspection records
  • Incident/NM tracking & corrective actions
  • As-built notes, redlines, and punchlists
  • Final audit-ready close-out package

How We Manage High-Risk Industrial Work

01) Scope & Study

Walkdowns, utility verification, route mapping, floor/soil checks, and sub/vendor matrix. Draft lift plans, LOTO, and JHAs.

02) Controls & Mobilization

Permits, barricades, equipment inspections, pre-task briefings, and sequencing aligned to production/outage windows.

03) Execute & Oversight

Daily audits, variance capture, QC/QA checks, and stakeholder updates. Integrated with Demolition and Rigging.

04) Close-Out & Value

Manifests, weight tickets, photo logs, and a final report. Document resale/recycling returns via Asset Recovery & Recycling.

Programs & Documentation

  • Daily photos, inspections, and sign-ins
  • Waste profiles, manifests, and ticket tracking
  • Owner/insurer audit-ready turnover packages
  • Change control, RFIs, and variance logs

FAQs

Do you embed on-site PM/Safety?

Yes. We can provide full-time on-site management to coordinate trades, documentation, and daily controls.

How do you align with our EHS team?

We supplement your staff with field-level execution and recordkeeping so your compliance standards are met without burdening operations.

What does a close-out package include?

Signed permits, LOTO charts, JHAs, lift plans, manifests, weight tickets, photos, and a final report.

Partner with WA Industrial for Safe, Predictable Results

From lift planning to final reporting — one accountable team across demolition, rigging, and recovery.